The garage is getting full...
Prayot dropped off two of his three parawings to have the canopies sewn up.
And I got the fill epoxy on the dings on this board repair.
The tail had two - the leash did not have a rail saver on it.
There was an open ding here.
The port rail gets a lot of love.
And these two were up by the nose.
I'll sand these down tomorrow and get fiberglass on top of them.
This board's bigger brother is sitting outside drying out (it is heavy with water inside I think).

No comments:
Post a Comment
Note: Only a member of this blog may post a comment.