Short description post (because you've seen this multiple times)
Laps sanded
Track taped over
Laminates laid out
Cover fabric prepped
Same pour as yesterday when laminating the top - 12 ounces resin and 4.8 ounces of hardener (and about 0.5 ounces of pigment)
I babysat this lamination - I didn't want any more surprises.
Then this evening I sanded the laps on the top deck
And this was the top deck fill coat. This pour was 5 ounces of resin and 2 ounces of hardener (fast).
I'll give a quick surface sand to the rails tomorrow and get the bottom fill coat on.
That means Tuesday I'll be sanding, placing the decals on the bottom deck, then adding a second fill (clear this time) coat.
Wednesday will be sanding the top deck, adding the labels, and placing that clear fill coat.
Thursday is sanding day and adding the vent and leash plugs. I can do that work in the morning and then sand the vent and leash plugs in the evening.
Friday should be clear coat. Saturday will see the deck pad go on - anointment will be conditions based. And it would be good for the board to gel and chill a bit before going into action.
No comments:
Post a Comment