Monday, February 24, 2025

Garage Works - 2/24/2025

This was yesterday's garage works session - 

I sanded down the signal window fill and placed the fiberglass patch - on both sides.


If the patches harden level, I'll do a quick sand and fill with clear coat.


I think the next project will be changing out the track box on No.32

Then after that, No.41 (which will probably be a 5'2" x 19.75" Foil Drive Max board (for the bigger waves of summer).

No comments: