Showing posts with label Custom Foil Boards. Show all posts
Showing posts with label Custom Foil Boards. Show all posts

Wednesday, October 2, 2024

Garage Works - 10/2/2024

And when I got home, I spent some time sanding the first fill coat on No.38


I'll put another coat of epoxy/white pigment on the top and bottom and sand that.  Norm asked for this to be white - so I'll get it more white than distress white.

After that sanding I'll get the logos on, then put a clear layer of epoxy, and do a final sanding. 


I'll still have to drill holes and install the vent and leash plug.


So - I think I have about six days of work left on this one.

Saturday, February 24, 2024

Garage Works - 2/24/2024

I have a few projects starting to pile up.

I split the 4x8 sheet of EPS foam into two blanks.  The one in the back is for Matt's 6'6" hybrid wing/prone/dw board.


I also set Ken's wing/SUP board up on its nose to get it to drain faster.  Lots of water was coming out.  I probably have a couple more days of drying before I can close this one up.


And Bill dropped off his new 80cm Project Cedrus Aluminum mast - he asked me to seal it.

Here is the group of cut up pool noodles inserted into the sections of the mast that may flood when the mast is used unsealed.


And here is the plastic bonding adhesive applied to the mast openings.  This one turned out nice!


I took a look at Harris's board - there wasn't enough sunshine to get the board to weep so that repair has to wait.

The really strong and consistent winds are forecasted to start tomorrow!!!

Tuesday, April 26, 2022

Kalani Picked Up His Wing Board

Kalani came over this evening.  He brought over the deck pad he found at Blue Planet and we did some trimming and setting to get the board all finished.








Happy camper!  

This was a long journey getting to this point.  We're making plans to bring this out on Sunday!!!