I got the fill coat of the top deck today.
This part of the build process just takes time. I don't like to sand a coat unless 24 hours has passed - makes it much easier to sand and get good results.
And for this board, after I get this base fill coat sanded, I'll place the logos and do a last fill coat with the ProLink epoxy.
I think this one will have more of the 'distressed carbon' look after sanding.
And to fill more of the lap gap and other low spots, I placed the drip tape further back. As I am writing this, I've already pulled the tape and gotten the board settled in the garage for the night.
Tomorrow I'll get the board sanded, washed, the logos placed and maybe get the first Prolink coat on.
That will leave Friday for the Prolink coat on the opposite deck.
Saturday should see the tracks opened, and final sanding.
No comments:
Post a Comment