Garage Works - 2/11/2026

And when I got back home, I worked on the projects on the rack.

First up was sanding down the signal window fills.  Here they are nicely sanded down and slightly below the surrounding area.


And here are the patches 


And here is everything epoxied in.

Tomorrow I get this modification faired in and then start on the laminate crack on the tail end of the bottom deck.  I'm trying to get this back to Kalani by Saturday morning.


And with the little bit of epoxy left over, I added a little more fill to the seam side of the footstrap insert reinforcement blocks.


As soon as I've gotten Kalani's board back to him, I'll start cutting open Roland's board to get these inserts placed.