Showing posts with label drilling. Show all posts
Showing posts with label drilling. Show all posts

Thursday, January 29, 2026

Garage Works - 1/29/2026

I got the detail work done this afternoon.

I drilled out the foot strap insert holes (pilot, bigger, biggest).


Then after some deliberating, I got the deck pads on with the holes punched for the foot strap screws. 

I also got the leash plug cleaned out and got the vent installed.


This came out really nice!


I'll let the deck pads sit for at least 24 hours -

I also lined up No.41 (Trench Board) to transfer the AFS Enduro 900 position - this is as good a starting place as any.

Feels good to have this one finished!

Wednesday, October 15, 2025

Garage Works - 10/15/2025

I did spend a little time dry fitting the M6 helicoils to the holes I cleared on Felipe's mast repair.


Turns out the holes that I had to dig out the sheared bolts were already big enough to accept the helicoil.

I had to clean up the open (third) hole a little bit.

Now it's time to mix up some JB Weld...