Spent a little time in the garage - it's actually been a little bit...
I started with installing the AFS USurf 135 onto the Silk 850/Standard fuselage setup. Going to take this out tomorrow to catch some bombs!!!
I took on a few repair jobs - first up is an older strut bladder repair. I took the bladder out and found I needed to re-glue the valve stem on.
Made marks to make sure everything goes back on correctly
High strength, flexible glue on the bladder
And on the valve foot. I got these put back together, but I'll go through the full cure before testing it.
And I even placed some epoxy - this is the tracks getting epoxied into place.
I will do some sanding to get the bottom prepared for more carbon fiber. And I'll likely get the carbon overlays epoxied into place as well.
No comments:
Post a Comment