I got No.45 across the finish line today -
I started out by sanding the plugs down flush.
Then I opened the tracks.
I had to clear some epoxy that made it through the tape...
Then I sprayed both sides with the 2K clear coat.
I still need to get a deck pad on and install the vent. I also need to cut out a rear foot deck pad and install the leash string. But other than that, this one is ready!!!
I have been thinking of reinstalling the front lines on the BRM S3 5.3 and 4.2 back to their original configuration. But I remembered that I had to cut the set of retention lines on the 5.3 to get the bridle lines free of the D handle.
This is a spliced line to replace the original. I think it may actually be easier to manage through the holes in the handle.
I'll burn the ends tomorrow and try to reinstall the original configuration.
No comments:
Post a Comment