Sunday, December 5, 2021

Garage Works - 12/5/2021

What better thing to do on a rainy weekend day than get some work done on long standing projects.  I got the footstrap inserts epoxied into Marvin's 4'1" Majek Bash and the 4'8" Wing Foiling Board (which looks giant compared to Marvin's board). 


Routed out the slots on both, then had to go help La with something, then came back, prepped the inserts (by sanding off the lip tabs and getting a scarification on the insert surfaces), and got them epoxied in their slots in both boards.

With this the hard part is over with Marvin's board - I've still got to deal with the mast track inserts on the Winging board....

No comments: